JammuVideo

Traffic inside Chenani-Nashri Tunnel suspended due to power shutdown

Traffic will resume after power connectivity is restored: SP Ramban

Ramban, Dec 09 : The traffic movement inside Chenani-Nashri Tunnel, also known as Dr Syama Prasad Mookerjee Tunnel was on Friday suspended due to a power shutdown, officials said here.

An official told the news agencyโ€”Kashmir News Observer (KNO) that traffic will resume after power connectivity is restored inside the tunnel.

He said the reason behind power shutdown inside the tunnel was not known immediately.

Meanwhile, SP Ramban, Mohit Sharma in a Tweet said: โ€œTraffic will resume after power connectivity restores. Inconvenience is regrettedโ€.โ€”(KNO)

Srinagar News

Srinagar News is one of the oldest newspaper in kashmir it was founded by Late Mehraj-ud-Din Wani Sahab in 1975.

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button